Statically Indeterminate Structure Phenomenon:

Each time there are more than two hoists on a truss or more than three hoists in a structure, it becomes statically indeterminate, resulting in an unpredictable load distribution. In most cases this will cause a load imbalance, in which some of the hoists may reach overload while others carry only a small part of the load.

The levelled truss illusion:

The belief that levelling a structure will automatically create an even load distribution is a dangerous misconception; no connection exists whatsoever between a levelled structure and one with an even load distribution. Because of the unpredictable load distribution, overload situations might happen to the most experienced riggers!

Fatigue rated load cells:

All Eilon Engineering load cells are fatigue rated, an important feature especially for fixed and long-term installations. The load cell’s ability to withstand successive load cycles for long periods of time without the risk of failure or damage to the steel, affords peace of mind for the user